Our projects are predominantly centred around dams and hydropower, however our skill base also allows for high quality geological assessment of any civil and mining project.
We have provided services for dam owners across Australia and New Zealand, with further dam and civil works in Oman, New Caledonia, Papua New Guinea, China, and Myanmar.
Our GIS abilities allow for project data to be captured and stored spatially, creating robust databases for the future.

Client: Great Divide Mining
Date: 2026 - Current

Client: Sunwater Limited
Date: 2025 - Current

Client: SEQWater
Date: 2025 - Current

Client: Damwatch Engineering Limited
Date: 2025 - Current

Client: SMEC
Date: 2024 - Current
As part of the staged strengthening, a revised foundation model was constructed following the review of historical data, in addition to new, high-resolution assessment of foundation areas. Included data assessment and reprocessing and GIS development.

Client: SMEC
Date: 2024 - Current
Cressbrook Dam is currently in the design phase for a Dam Safety Improvement Project which will include a widening of the existing spillway. Included site supervision of drilling through a live embankment, instrument installation, and construction material resource identification and assessment.

Client: Engeny
Date: 2024 - Current
A new off stream water storage is required to supply the mine with process water. Included geological mapping of the proposed footprint of the proposed storage, in addition to the identification and assessment of potential construction resources. Completed the geological interpretation and GIS development to assist with engineering.

Client: Engeny
Date: 2025 - Current
A review of existing exploratory data was completed prior to a limited intrusive investigation to improve confidence around the likely extension of a construction material resource for the Regional Council. Included conceptual pit arrangement and preliminary volume estimation.

Client: SMEC
Date: 2019 - 2020
This dam safety review included the review of existing borehole logs and re-logging of historical core stored on site to update material and defect descriptions. Re-assessment of foundation conditions and kinematic assessment of defect sets. Included the development of a detailed GIS and spatial registration of historical mapping.

Client: SMEC
Date: 2021 - 2024
Responsible for reviewing documentation, rock core, soil samples, and other site-specific information for local conditions of the dam foundation, abutments, appurtenant structures, tunnels, powerhouses, and potential borrow areas. Provision of technical review and design guidance as part of the Owner's Eng
Client: SMEC
Date: 2021 - 2024
Responsible for reviewing documentation, rock core, soil samples, and other site-specific information for local conditions of the dam foundation, abutments, appurtenant structures, tunnels, powerhouses, and potential borrow areas. Provision of technical review and design guidance as part of the Owner's Engineering Team, Engagement with design consultants and Technical Review Panel.

Client: SA Water Limited
Date: 2021 - 2024
Responsible for the review of geological and geotechnical data relating to the dam and borrow areas, design of a geotechnical investigation of the dam and auxiliary spillway, development of a Geotechnical Interpretive Report, and design input parameters. Engagement with Technical Review Panel.

Client: Pacific Hydro Limited
Date: 2021 - 2023
Responsible for geological review of proposed scheme options and development of staged geological and geotechnical investigation.

Client: Damwatch Engineering Limited
Date: 2019 - 2023
Technical review of geological and geotechnical matters during re-design and construction.

Client: Conservation and Environment Protection Authority, Government of Papua New Guinea
Date: 2019 - 2023
This project involved technical review of the Freida River Hydroelectric Project (FRHEP) embankment, temporary infrastructure, comprehensive gap analysis of the design report, and geotechnical stability of the TSF embankment.

Client: Regional Development Australia (Tropical North)
Date: 2020 - 2023
Responsible for the reconnaissance, design, and execution of the geological investigation of the proposed dam site and hydroelectric generation scheme.

Client: Sunwater
Date: 2020 - 2024
Member of the Technical Review Panel for the Rookwood Weird Project, constructed on the Fitzroy River. Responsible for review of geological and geotechnical matters.

Client: Townsville Enterprises Limited
Date: 2020 - 2022
Responsible for the design and specification of the geological and geotechnical investigation, and internal technical review of the project.

Client: WaterNSW
Date: 2020 - 2022
This project involved the review of foundation defects and the rock mass to determine appropriate input values for use in the overall dam stability analysis for Burrinjuck Dam.

Client: Sunwater
Date: 2018
Completed geological assessment of two dam sites (Main and Saddle Dam) as part of a feasibility study for a proposed new dam for irrigation and industrial water supply.